TaskRox connects project controls, operational readiness, fleet, workforce, HSE, QA, documents, cost and reporting for both capital projects and ongoing operations.
Platform proof points
49
Platform features total
Includes 32 project modules plus 17 platform-level features.
32
Project modules
Includes Dashboard, Gantt, QA/HSE, documents, correspondence, SMS, plant/workforce and commercial workflows.
AI
Integrated context engine
Uses connected project records to draft high-quality responses fast, surface contract/spec context, and generate project or whole-of-org summaries in minutes.
4
Access levels
None, View, Edit and Admin for internal teams and external partners, with templates plus per-member overrides.
TaskRox is structured around the main feature areas project and operations teams use every day.
Plan, sequence, assign and communicate work across projects and ongoing operations without breaking flow between site and office.
Run controlled workflows for QA, incidents, hazards, forms, investigations, planning packs and change control from the same platform.
Keep one controlled document library connected to RFIs, QA, HSE, MOC, decisions, correspondence, reviews and every record that needs evidence — and sign the contractual ones with legally-defensible, tamper-evident e-signature.
Connect fleet, asset tracking, QR custody, Plant Library, project resources, training and workforce readiness so every project or site knows who and what is actually ready to move. Build structured experience profiles from CV uploads with AI parsing to filter personnel by industry sector and skills. Run a governed Talent Pool of prospects with self-serve CSV/CV import, project-fit ranking, duplicate merge, a recruitment funnel, and one-click convert-to-engaged.
Quick access to all 49 platform features: 32 project modules and 17 platform-level features.
For pre-configured workspaces, TaskRox supports controlled pay-run review, finalisation and reversal with ATO Schedule 1 PAYG, 12% SG, STP Phase 2 files, compliant payslips and BECS bank files.
Active ruleset provenance and every material transition stay auditable. The public Payroll guide records the current setup boundary, supported scenarios and full scope disclosure.
TaskRox brings scheduling, short-horizon execution, daily reporting and communication into the same environment for both finite projects and ongoing operations — so the work moves with less re-entry and less context loss.
Operational impact
Delivery and operations teams keep planning, site updates and communication in one working loop, which reduces context switching and keeps execution decisions closer to current field reality.
Quality and HSE are no longer side registers bolted onto delivery. TaskRox gives them proper workflows, templates, traceability and linked records across the project lifecycle.
Governance impact
Projects can defend closeout decisions with a cleaner evidence chain from request to action to sign-off, instead of scattered forms and disconnected approval records.
Documents, RFIs, project correspondence, decisions and reporting belong together. TaskRox controls each file and revision, connects it to the technical record, and keeps practical preview, edit and recovery paths clear for every format.
Technical control impact
Engineering and project teams move from document issue through correspondence and response to resolution with fewer handoffs, making audits, reviews and reporting cycles faster to run.
Prepare, route, sign, track and seal contractual documents inside TaskRox. Internal teams and external counterparties use one coherent workflow, with no separate e-signing subscription or customer portal to administer.
Signing impact
Contractual sign-off stays on the same platform that generated the document and holds the project record, so signed copies land straight back into document control with a full evidence trail — instead of bouncing through a separate signing vendor.
Every construction project generates hundreds of emails — tender queries, contract notices, superintendent directions, stakeholder questions, HR and recruitment threads, consultant RFIs. They scatter across personal inboxes, get missed, get forwarded without context, and the project record never sees them. TaskRox Correspondence brings all of that into one governed project folder with AI that actually understands the job.
Correspondence impact
Project teams spend less time hunting through inboxes and more time acting on correspondence that matters. The AI drafts responses with live project context, formal communications go through proper review channels, and every thread links back to the records it affects.
TaskRox spans fleet management, asset tracking, QR asset custody, plant intelligence, project resources, training and workforce readiness so every project or operation reflects the actual capability available to deliver the work.
Readiness impact
Mobilisation and operational readiness decisions become easier to trust when fleet, asset tracking, QR custody, plant context, workforce competency and deployment status are connected in one readiness view.
TaskRox carries commercial control beyond a budget summary: head contracts, commitments, cost allocations, variations, claims, retention and linked evidence stay beside the delivery records that drive them.
Commercial impact
Commercial and reporting outputs stay closer to operational source records, so leaders spend less time reconciling mismatched spreadsheets before reviews or client updates.
TaskRox does not strip features into upsells. Pro is the full platform for normal project, ops, and site teams. Enterprise adds organisational controls — not extra modules. Storage beyond the plan allowance is the only thing that can add to your bill, and it is disclosed before it creates a charge. AI usage is not billed.
Per-user AUD pricing. No credit card required for the trial. Cancel anytime.