Topic: Project settings
General
Modules
Project settings
Per-project configuration: scheduling calendar, team roles, and general settings.
Accessing project settings
Two entry points:
- Sidebar — the gear icon at the bottom of each project's module list.
- Gantt toolbar — the calendar-cog icon links directly to the Schedule tab.
The URL is /projects/[projectId]/settings.
Schedule tab
Configure the project's scheduling calendar:
Calendar preset — select one to auto-fill all fields. Options: 5-8 Mon–Fri 8 hours, 5-10 Mon–Fri 10 hours (default), 7-12 Mon–Sun 12 hours, 7-24 Mon–Sun 24 hours, Custom.
Working days — checkboxes for Mon–Sun.
Work hours — shift start and end times.
Hours per day — used in Gantt duration tooltips (e.g. "5d = 50h").
Night shift — toggle on for 24/7 projects. Adds night start/end fields.
FS successor start — Next working day (skip weekends) or Next calendar day (no skip, for 24/7).
Non-working dates — add public holidays and shutdowns. These are shipped past when computing FS constraints.
Team tab
View all project members. For each member:
- Current org role (Owner/Org Admin/Member)
- Assigned role template (dropdown to change)
- Expandable per-module permission grid showing effective permission level and any overrides
Click a module's permission level to set an override for that member. The override shows in a different colour.
General and notifications tabs
Project Settings also includes General and Notifications tabs for project-scoped configuration.
Use these tabs for project-level defaults and notification behaviour as those settings expand. Keep in mind that Project Settings is contextual to the active project and is not part of the global Settings area.